Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | redruth, treleigh |
Date time: | 12.23pm, Friday 4th June, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bodmin |
When Treleigh was bypassed, decent arrangements were made for cyclists to use the old road through the village.
Comments reflect the views of the original submitter only.